Please choose the filter for those sectors and competences you are interested in. By clicking the button "show", projects are listed that DERU has been in charge of in the selected sectors and fields of competence.

References

Sector filter:

Competence filter:

Logo von Fraunhofer Institute for Integrated Systems and Device Technology (IISB) Research and teaching

Fraunhofer Institute for Integrated Systems and Device Technology (IISB)

New construction of an extension building in Erlangen

Architecture: weinbrenner.single.arabzadeh, architektenwerkgemeinschaft
Image: 3DBO
Grafik +Visualisierung,
Andreas Boldt

  • Labs and working rooms, technical centre for HVDC systems, workshops as well as offices
  • Engineering of
    • Sewage, water and heat supply systems
    • Ventilation, air-conditioning and refrigeration systems
    • Media supply systems
    • Special equipment
      • CHP and industrial scale refrigeration storage
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
Gross floor space:
ca. 4,220 m²
Floor space 1-6 according to German DIN 277-2:
ca. 1,920 m²
Technical centre and lab space:
ca. 1,170 m²
Costs of the technical systems:
ca. 2.7 m EUR plus VAT
Project run time:
since 2014
Logo von Technische Universität Chemnitz Research and teaching

Technische Universität Chemnitz

New construction of the Centre for materials, architectures and integration of nanomembranes (MAIN)

Architecture and image: Heinle, Wischer und Partner, Dresden

  • Physical and chemical labs as well as clean rooms
    • Altogether 11 lab cluster
  • Engineering of any technical systems
    (except conveying systems)
  • Layout and lab design
  • Hook up
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Currently support

Gross floor space:
ca. 9,600 m²
Floor space 1-6 according to German DIN 277-2:
ca. 3,800 m²
Clean room space:
ca. 345 m²
Clean room class:
7 according to DIN EN ISO 14644-1 (partially ISO 5)
Costs of the technical systems:
ca. 11.4 m EUR plus VAT
Project run time:
since 2013

Logo von European X-Ray Free-Electron Laser Facility GmbH Research and teaching

European X-Ray Free-Electron Laser Facility GmbH

New construction of the main building in Schenefeld
Architecture and image: BLUNCK+MORGEN, Hamburg
  • Labs of the security levels 1 and 2 according to German GenTG, laser rooms, cleanrooms as well as offices
  • Engineering of any technical systems (except conveying systems) for the main building above ground
  • Layout and lab design
  • Engineering of media and energy supply systems in the subterranean experimental hall
  • Services phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 16,765 m²
Main floor space:
ca. 8,000 m²
Lab space:
ca. 2,400 m²
Costs of the technical systems:
ca. 16 m EUR plus VAT
Project run time:
2012-2017

Logo von University of Applied Sciences Mittweida Research and teaching

University of Applied Sciences Mittweida

New construction of the Institute for Laser Technology

Architecture: pbr Planungsbüro
Rohling AG

Photo: DERU

  • Labs and clean rooms, offices and meeting rooms
  • Engineering of
    • Clean room ventilation
    • Clean room construction
    • Media supply systems
    • Laboratory equipment
    • Process refrigeration and process exhaust air systems
    • Building automation system
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 6,410 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,650 m²
Clean room space:
ca. 500 m²
Clean room classes:
8 and 6 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 3.7 m EUR plus VAT
Project run time:
2012-2017

Logo von IHP GmbH Leibniz-Institut für Innovative Mikroelektronik Semi-conductors Research and teaching

IHP GmbH Leibniz-Institut für Innovative Mikroelektronik

Enlargements, conversion and restructuring measures at the IHP in Frankfurt (Oder)

Photo: DERU

  • Tender procedures for general agreements of executing firms (technical as well as structural systems)
  • New construction and conversion of central media systems
  • Conversion of chemical and  physical labs
  • Installation of the Nano lab clean room
  • Hook up
  • Services phases according to German HOAI
    • Preliminary engineering to construction supervision
Spaces:
ca. 450 m² (labs)
ca. 300 m² (Nano lab clean room)
ca. 280 m² (work shop)
Clean room class:
6 according to DIN EN ISO 14644-1
Costs of the structural and technical systems:
ca. 3 m EUR plus VAT
Project run time:
2014-2016
Logo von Research Institute of Leather and Plastic Sheeting (FILK) Life Science Research and teaching

Research Institute of Leather and Plastic Sheeting (FILK)

Installation of a lab and communication complex in Freiberg
Photo: DERU
  • Chemical-physical labs, partially labs of the security levels 1 and 2 according to German GenTG
  • Offices, meeting and seminar rooms, aula and lecture room as well as cafeteria
  • Engineering of any technical systems
    (except conveying systems)
  • Layout and lab design
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
Gross floor space:
ca. 5,155 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,590 m²
Lab space:
ca. 1,250 m²
Costs of the technical systems:
ca. 3.9 m EUR plus VAT
Project run time:
2010-2016
Logo von Stadtverwaltung Freiberg Research and teaching

Stadtverwaltung Freiberg

Inside modernisation of the historical granary in Freiberg
Photo: DERU
  • Late Gothic storehouse
  • City library and commercial units
  • Engineering of
    • Heat supply, sanitary and ventilation systems
    • Heat pumps with geothermal probe; wall surface heating
    • Building automation system
  • Calculation of profitability
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
    • Currently support

Gross floor space:
ca.  4,290 m²
Gross volume capacity:
ca. 16,470 m³
Floor space 1-6 according to German DIN 277-2:
ca. 2,030 m²
Costs of the technical systems:
ca. 730,000 EUR plus VAT
Project run time:
2013-2015

Logo von Fraunhofer Institute for Silicon Technology Research and teaching Semi-conductors

Fraunhofer Institute for Silicon Technology

New construction of a second clean room in Itzehoe
Architecture and image: HTP Architekten, Brunswick
  • Research clean room for developing
    • Components of power electronics
    • Novel microsensors
  • Engineering of any technical systems
  • Layout design
  • Hook up
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Currently support
  • Project coordination

Gross floor space:
ca. 12,170 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,500 m²
Clean room class:
5 according to DIN EN ISO 14644-1 (partially ISO 4)
Costs of the technical systems:
ca. 16 m EUR plus VAT
Project run time:
2009-2015

Logo von Fraunhofer Institute for Transportation and Infrastructure Systems Research and teaching

Fraunhofer Institute for Transportation and Infrastructure Systems

New construction of a technical centre with connected oval test track in Dresden

Architecture: KILIANARCHITEKTEN, Dresden

Photo: DERU

  • Technical centre including
    • Test hall and car workshop
    • Engine and battery test benches
    • Measuring rooms and offices
    • Crane way 2.5 t
  • Transfer of the existing container location
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 1,615 m²
Floor space 1-6 according to German DIN 277-2:
ca. 990 m²
Costs of the technical systems:
ca. 1.1 m EUR plus VAT
Project run time:
2011-2015

Logo von Helmholtz-Zentrum Dresden-Rossendorf e. V. Research and teaching

Helmholtz-Zentrum Dresden-Rossendorf e. V.

Preparation for the set up of a Super-SIMS in Dresden-Rossendorf
Photo: HZDR
  • Set up of a Super-SIMS in the 6 MV tandem accelerator hall
  • High-voltage protection
    (30 kV)
  • Engineering of
    • Ventilation systems and room-in-room construction
    • Power, Telecommunication and IT systems
    • Media supply systems
    • Building automation system
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

SIMS = Secondary ion mass spectrometry

  • ultrasensitive analytical method for the determination of stable elements and isotopes


Accelerator hall:
Radiation protection controlled area
Costs of the technical systems:
ca. 300,000 EUR plus VAT
Project run time:
2012-2014

Logo von Helmholtz-Zentrum Dresden-Rossendorf  e. V. Research and teaching

Helmholtz-Zentrum Dresden-Rossendorf e. V.

Installation of a helium liquefaction plant including high pressure depot
Photo: DERU
  • New construction of a building as well as installation of the helium liquefaction plant
  • Engineering of
    • Sewage and water systems
    • Ventilation and air-conditioning systems
    • Power systems
    • Telecommunication and IT systems
    • Media supply systems
    • Building automation system
  • Service phases according to German HOAI
    • Basic engineering to construction supervision

Gross floor space:
ca. 285 m²
Gross volume capacity:
ca. 1,800 m³
Condenser capacity:
ca. 100,000 l Lhe/annum
High-pressure depot:
35 m³ geometric storage volume at 200 bar
Costs of the technical systems:
ca. 620,000 EUR plus VAT (without liquefaction plant)
Project run time:
2012-2014

Logo von Crime scene task force at Landeskriminalamt Magdeburg Life Science

Crime scene task force at Landeskriminalamt Magdeburg

Dactyloscopic lab
Photos: DERU
  • Forensic lab of the security level 2 according to German GenTG
  • Engineering of lab systems as
    • Dissecting table with air supply element
    • 4 laboratory fume hoods coated with stainless steel, one of it walk-in
    • Air locks for material and staff
  • Service phase according to German HOAI
    • Preliminary engineering to construction supervision

Floor space 1-6 according to German DIN 277-2:
ca. 153 m²
Costs of the technical systems:
ca. 163,000 EUR plus VAT
Project run time:
2012-2014

Logo von Technical University Dresden Research and teaching Semi-conductors

Technical University Dresden

New construction of a research facility at the Mierdel building

Architecture: Blum & Schultze Architekten, Dresden

Photo: DERU

  • Engineering of
    • Technical gases, compressed air, central vacuum, gas detection system
    • HPW
    • Process cooling water
    • Lab equipment
  • Layout design
  • Hook up
  • Service phase according to German HOAI
    • Preliminary engineering to construction supervision
  • Organisation and monitoring of the relocation

Gross floor space:
ca. 7,320 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,268 m²
Number of tools:
48
Costs of the technical systems:
ca. 1.3 m EUR plus VAT
Project run time:
2009-2013

Logo von Fraunhofer Institute for Machine Tools and Forming Technology Research and teaching

Fraunhofer Institute for Machine Tools and Forming Technology

New construction of a model factory for resource efficient production in Chemnitz

Architecture: Stefan Ludes Architekten, Berlin

Photo: DERU

  • Set up of an energy self-sufficient factory with
    • CHP
    • Energy storage system flywheel mass
      (only planning)
    • Photovoltaics systems
  • Engineering of
    • Power systems
    • Telecommunication and IT systems
    • Conveyor systems (crane way 40 t)
    • Building automation system
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 3,420 m²
Gross volume capacity:
ca. 35,290 m³
Floor space 1-6 according to German DIN 277-2:
ca. 2,150 m²
Costs of the technical systems:
ca. 2.2 m EUR plus VAT
Project run time:
2010-2013

Logo von Pharmaceutical production Life Science

Pharmaceutical production

Consulting services for a conversion project in Dresden
  • Conversion of pharmaceutical work rooms, stores, cold rooms and airlocks
  • Hook up to existing basic supply systems
  • Consulting for
    • Ventilation and air-conditioning systems
    • Building automation system

Space:
ca. 200 m²
Clean room class:
D according to annex 1 of the GMP guideline
Project run time:
06/2013-07/2013

Logo von AEMtec GmbH Berlin Semi-conductors

AEMtec GmbH Berlin

New construction of a production facility including a clean room in Berlin

Architecture and image: BBF Baubüro Freiberg GmbH

  • General engineering
    • Building
    • Supporting structure
    • Technical systems
    • Outdoor facilities
  • Service phases according to German HOAI
    • Preliminary engineering to support

 

Gross floor space:
ca. 5,500 m²
Clean room space:
ca. 2,000 m²
Clean room classes:
8 and 7 according to DIN EN ISO 14644-1
Project run time:
2011-2013

Support:
2013-2018

Logo von Technical University Dresden Research and teaching

Technical University Dresden

Conversion and modernisation of the Walther-Hempel building for the chemical institutes

Architecture: AWB Architekten, Dresden 

Photo: DERU

  • Set up in 1962 in reinforced concrete skeleton construction
  • Technical, macromolecular as well as specific physical chemistry, NMR spectrometer
  • Engineering of
    • Sewage, water and gas systems
    • Heat supply systems
    • Ventilation, air-conditioning and refrigeration systems
    • Media supply systems
    • Building automation system
  • Service phases according to German HOAI
    • Basic engineering to construction supervision

Gross floor space:
ca. 5,600 m²
Floor space 1-6 according to German DIN 277-2:
ca. 2,430 m²
Lab space:
ca. 1,560 m²
Costs of the technical systems:
ca. 2.3 m EUR plus VAT
Project run time:
2008-2013

Logo von Bosch Solar Energy AG - Bosch Solar Wafers GmbH - Robert Bosch GmbH Photovoltaics

Bosch Solar Energy AG - Bosch Solar Wafers GmbH - Robert Bosch GmbH

Site expansion for the production of crystalline solar cells and wafers in Arnstadt

3D design of the ventilation plant Cell Fab 3

Graphics: DERU

  • New construction, extension and optimisation of the technical systems and supply technology
  • Hook up, hook down
  • Planning of tool relocations
  • Compilation of facility descriptions, hazard assessment and work instructions
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
  • Production of wafers
  • Manufacturing of crystalline, silicon-based thick-film solar cells
  • Module production

Number of tool movements:
244
Project run time:
2008-2013

Logo von Pharmaceutical production Life Science

Pharmaceutical production

Consulting service for alternative concepts for the combined steam, hot water and power generation by steam turbine in Weimar
  • Comparison of different procedures
  • Consulting for
    • Heat supply systems
    • Power systems
Project run time:
08/2012-10/2012
Logo von Fraunhofer Institute for Cell Therapy and Immunology Research and teaching Life Science

Fraunhofer Institute for Cell Therapy and Immunology

New construction of the first extension building in Leipzig

Architecture: Heinle, Wischer und Partner, Stuttgart

Photo: DERU

  • Laboratories of the security level 2 according to German GenTG
  • GMP labs
  • Small and large animal surgeries
  • Veterinary diagnostics (MRT)
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Gross floor space:
ca. 3,760 m²
Main floor space:
ca. 1,570 m²
Clean room space:
ca. 450 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of technical systems:
ca. 5.7 m EUR plus VAT
Project run time:
2008-2013

Logo von All Silicon System Integration Dresden (ASSID) Research and teaching Semi-conductors

All Silicon System Integration Dresden (ASSID)

Conversion of a clean room at the Fraunhofer IZM in Moritzburg
Photo: DERU
  • Engineering of
    • Energy saving as well as adjustment of basic supply
    • Clean room conversion
    • Hook down / relocation / Hook up for existing equipment
    • Hook up of new equipment
    • Waste water treatment
    • Retrofitting and new construction of process gas supply systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 4,300 m²
Clean room space:
ca. 756 m²
Number of tool relocations:
37
Number of new tools:
32
Costs of the technical systems:
ca. 4.7 m EUR plus VAT
Project run time:
2010-2011

Logo von Freiberger Compound Materials GmbH Semi-conductors

Freiberger Compound Materials GmbH

Set up of a combined heat and power plant (trigeneration) in Freiberg
Photos: DERU
  • Analysis of the energy flows in all energy supply and consumer systems by simulation
  • Engineering of
    • Sewage, water and gas systems
    • Heat supply systems
    • Refrigeration systems
    • Power systems
    • Building automation system
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Total output of the two identical CHP modules:
1,200 kWel
1,586 kWth
Refrigerating capacity of the absorption refrigeration system:
800 kW
Investment costs:
ca. 2.3 m EUR
Project run time:
2008-2011

Logo von Pharmaceutical production Life Science

Pharmaceutical production

Set up of a cytostatic production area of a pharmacy in Dresden
  • Consulting
  • Layout design
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Preliminary engineering to approval engineering

Scope:
3 production rooms with three safety cabinets each
Costs of the technical systems:
ca. 1.1 m EUR plus VAT
Project run time:
2010-2011

Logo von Pharmaceutical production Life Science

Pharmaceutical production

GMP qualification of a cytostatic production area of a pharmacy in Plauen
  • GMP consulting
  • Supervision of the construction design
  • Qualification of the GMP relevant devices, supply systems and rooms
    • Ventilation and air-conditioning systems
    • Monitoring system
    • Compressed air and nitrogen supply systems
    • Safety workbenches, fridges, autoclave, hot air steriliser
  • Qualification phases
    • DQ, IQ, OQ

Clean room space:
ca. 100 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Project run time:
2009-2011

Logo von APOGEPHA Arzneimittel GmbH Life Science

APOGEPHA Arzneimittel GmbH

Conversion of the pharmaceutical production area in Dresden

Photo: APOGEPHA

  • Engineering of the building services
  • Gradual detail engineering and tender
  • Technical consulting at the construction site
  • Consulting services
  • Qualification according to GMP
    • Assistance in compiling specifications (solvents, compressed air and nitrogen)
    • Execution of IQ and OQ for solvent supply (IPA and acetone)
Costs of the building services:
ca. 1.5 m EUR plus VAT
Project run time:

2010-2011
Logo von Plastic Logic GmbH Semi-conductors

Plastic Logic GmbH

New construction of a production clean room and its appendant administration building in Dresden
Graphics: DERU
  • Administration building:
    • All technical systems
  • Production hall:
    • Heat supply systems
    • Ventilation and air-conditioning systems
    • Media supply systems
      • Process cooling water
      • High-purity gases and bulk gases
      • Basic chemicals
      • High-purity water
    • Building automation system
  • Hook up
  • Detail engineering to construction supervision

Gross floor space:
ca. 9,000 m²
Gross volume capacity:
ca. 86,000 m³
Clean room space:
ca. 4,000 m²
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Project run time new construction:
2007-2008
Project run time hook up:
2007-2010

Logo von Leibniz Institute for Solid State and Materials research Dresden Research and teaching

Leibniz Institute for Solid State and Materials research Dresden

Installation of a helium liquefaction plant including high pressure depot

Photo: IFW Dresden

  • Engineering of
    • Heating and sanitary systems
    • Smoke extraction system
    • Electrical systems
    • Safety lighting
    • Lightning protection plan
    • Fire alarm system
    • Media supply systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Project management of architectural and engineering services

Gross floor space:
ca. 365 m²
Condenser capacity:
ca. 100,000 l Lhe/annum
High-pressure depot:
25 m³ geometric storage volume at 200 bar correspond to ca. 5,000 m³ He
Overall costs:
ca. 2.8 m EUR plus VAT
Project run time:
2007-2010

Logo von Pharmaceutical production Life Science

Pharmaceutical production

New construction of an Highly Purified Water system as well as conversion of a waste water system in Halle (Saale)
  • GMP system for manufacturing pharmaceutical proteins
  • Engineering of
    • Media supply systems (water treatment)
    • Waste water systems
    • Power systems
    • Building automation system
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Generation capacity of the Highly Purified Water (WHP) system:
1.5 m³/h
Retrofit of storage tank pure steam generator:
500 kg/h
Costs of the technical systems:
ca. 326,000 EUR plus VAT
Project run time:
2009-2010

Logo von ZytoService Deutschland GmbH Life Science

ZytoService Deutschland GmbH

Set up of a cytostatic production area in Hamburg
Graphics: DERU
  • Manufacturing of patient-related cytostatic preparations and sterile nutrient solutions
  • Engineering of any technical systems including
    • Clean room construction as well as
    • Automated decontamination and transport systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Floor space:
ca. 2,300 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of the structural and technical systems:
ca. 6.5 m EUR plus VAT
Project run time:
2009-2010

Logo von Research Institute of Leather and Plastic Sheeting (FILK) Research and teaching Life Science

Research Institute of Leather and Plastic Sheeting (FILK)

Set up of a clean room technical centre for the production of collagen in Freiberg
Photo: FILK gGmbH
  • Two independent processing rooms for wet and dry processes
  • Installations in an institute building from around 1900
  • Engineering of the technical systems including clean room construction
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
  • Coordination of all parties involved

Gross floor space:
ca. 215 m²
Floor space:

ca. 70 m²
Clean room class:
8 according to DIN EN ISO 14644-1
Costs of the structural and technical systems:
ca. 433,000 EUR
Project run time:
2008-2009

Logo von X-FAB Dresden GmbH & Co. KG Semi-conductors

X-FAB Dresden GmbH & Co. KG

Conversion of central media systems as well as set up of an 8-inch production line
Photos: DERU
  • Hook up
  • Conversion and extension of
    • Process exhaust air systems and a clean room air handling unit
    • Central chemicals supply systems
    • Bulk and process gas supply systems
    • Highly Purified Water and waste water systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Planning and monitoring of the move in

Number of new tools:
30
Number of tool relocations:
6
Project run time:
2008-2010

Logo von Center of Organic Materials and Electronic Devices Research and teaching Semi-conductors

Center of Organic Materials and Electronic Devices

Conversion of a clean room at the Fraunhofer IPMS in Dresden
Photo: IPMS
  • Conversion while operations were running
  • Engineering of
    • Heating and sanitary systems
    • Ventilation, air-conditioning and refrigeration systems
    • Electrical systems
    • Process exhaust air
    • High-Purity Water
  • Fire protection measures
    • Sprinklers
    • Fire alarm system throughout facilities
    • Smoke extraction system
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 7,740 m²
Clean room space:
ca. 900 m²
Clean room class:
4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.25 m EUR plus VAT
Project run time:
2007-2009

Logo von University of Bielefeld with an area of use for computer-assisted biotechnology at the University of Applied Sciences Bielefeld Research and teaching Life Science

University of Bielefeld with an area of use for computer-assisted biotechnology at the University of Applied Sciences Bielefeld

New construction of a lab facility for genomic and bioinformatics

Architecture: BLB NL Bielefeld

Photo: DERU

  • Labs of the safety classes 1 and 2 according to the German GenTG
  • Chemicals of the protection level IV of the German GefStoffV (HSA)
  • Clean rooms
  • Labs for the nanosciences with vibration-free work places (attosecond spectroscopy, ultra-microscopy)
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 10,000 m²
Main floor space:

ca. 4,400 m²
Lab space:

ca. 2,700 m²
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 13.3 m EUR plus VAT
Project run time:

2003-2009 (in two construction stages)

Logo von Technische Universität Chemnitz Research and teaching Semi-conductors

Technische Universität Chemnitz

New construction of the Institute for Physics including a clean room "wafer processing"

Architecture: rohdecan Architekten, Dresden

Photo: DERU

  • Labs, clean rooms and offices
  • Geothermal heat exchanger
  • Helium recovery
  • Engineering of any technical systems except electrical systems
  • Hook up
    • Equipment for the microelectronics
    • Equipment for physics
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 11,200 m²
Main floor space:
ca. 4,920 m²
Clean room space:
ca. 510 m²
Clean room classes:
7 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 6.1 m EUR plus VAT
Project run time:
2005-2008

Logo von NaMLab gGmbH Dresden Research and teaching Semi-conductors

NaMLab gGmbH Dresden

New construction of a lab and office building including a clean room in Dresden

Architecture: Blum & Schultze Architekten, Dresden

Photo: DERU

  • Engineering of
    • Ventilation, air-conditioning and refrigeration systems
    • Conveying systems
    • Technical gases with gas detection system, compressed air, vacuum
    • Lab equipment
    • HPW and neutra
    • Process cooling water
  • Hook up
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 1,500 m²
Number of tools:
21
Clean room classes:
6 and 5 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 2.6 m EUR plus VAT
Project run time:
2006-2008

Logo von Fraunhofer Institute for Cell Therapy and Immunology Life Science Research and teaching

Fraunhofer Institute for Cell Therapy and Immunology

New construction of the main building in Leipzig

Architecture: Heinle, Wischer und Partner, Stuttgart

Photo: DERU

  • Cell culture labs, biological, biochemical and chemical labs of the security level 2 according to German GenTG
  • Isotope lab
  • Cold storage cells up to
    -20 °C
  • Offices, cafeteria, lecture hall and library
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space:
ca. 10,500 m²
Main floor space:
ca. 4,130 m²
Lab space:
ca. 2,100 m²
Costs of the technical systems:
ca. 6.9 m EUR plus VAT
Project run time:
2006-2008

Logo von Federal Environment Office Bad Elster Life Science Research and teaching

Federal Environment Office Bad Elster

Conversion and modernisation of labs
Photo: DERU
  • Labs of the security level 2 according to German GenTG
  • Radiologic labs
  • Wet-chemical labs
  • Installations while operation was running in four construction stages
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision
  • Leading project coordination

Gross floor space:
ca. 2,550 m²
Lab space:
ca. 890 m²
Costs of the technical systems:
ca. 1.7 m EUR plus VAT
Project run time:
2003-2007

Logo von Technology and Founder's Centre Halle GmbH Life Science

Technology and Founder's Centre Halle GmbH

Supply technology for a pilot plant for producing pharmaceutical proteins
Photos: DERU
  • Disposal and supply technology
    • Aqua purificata generation and distribution
    • Pure steam and process steam generation and distribution
    • Cleaning-in-place systems
    • Process air, N2, O2
    • Buffer preparation, CIP-chemicals
    • Waste water deactivation
  • Service phases according to German HOAI
    • Preliminary engineering to construction
  • Qualification according to GMP (QMP..PQ1)

GMP clean room space:
ca. 800 m²
Clean room classes:
8 to 5 according to DIN EN ISO 14644-1
Security levels according to German GenTG:
S1, S2
Costs of the technical systems:
ca. 3.7 m EUR plus VAT
Project run time:
2006-2007

Logo von Fraunhofer Institute for Photonic Microsystems and Fraunhofer Institute for Nondestructive testing Research and teaching Semi-conductors

Fraunhofer Institute for Photonic Microsystems and Fraunhofer Institute for Nondestructive testing

Modernisation of the buildings 55 and 56 in Dresden

Architecture: KILIANARCHITEKTEN, Dresden

Photo: DERU

  • Physical and chemical labs as
    • X-ray tomography, focused ion beam lab, laser measuring room, microscopy lab, radionuclide lab and X-ray diffraction
    • Clean rooms
  • Installation while operation running
  • Engineering of any technical systems
  • Layout design
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision

Gross floor space:
ca. 16,000 m²
Main floor space:
ca. 7,900 m²
Lab space:
ca. 2,300 m²
Clean room classes:
partially 6, 5 and 4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 4.5 m EUR plus VAT
Project run time:
2003-2006 (in several construction stages)

Logo von Technical University Dresden Research and teaching Semi-conductors

Technical University Dresden

New construction of a clean room section at the Mierdel building

Architecture: Blum & Schultze Architekten, Dresden

Photo: DERU

  • Engineering of media supply and disposal systems
  • Layout design and technical room book
  • Hook up
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Organisation and monitoring of the relocation

Gross floor space:
ca. 2,170 m²
Number of tools:
36
Clean room class:
4 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 1.45 m EUR plus VAT
Project run time:
2002-2006

Logo von Fraunhofer Institute for Cell Therapy and Immunology Research and teaching Life Science

Fraunhofer Institute for Cell Therapy and Immunology

Set up of GMP labs for the Fraunhofer IZI at the BioCity Leipzig
Photos: DERU
  • GMP labs of the security level 2 according to German GenTG
  • 4 independent process suites for changing users
    • 8 sterile labs (clean room class B)
    • Weighing cabinets and preparation rooms (clean room class C)
    • Washing area and cryo storage
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
  • Qualification according to GMP

Gross floor space:
ca. 500 m²
Clean room space:
ca. 355 m²
Clean room classes:
A to D according to annex 1 of the GMP guideline
Costs of the technical systems:
ca. 1.6 m EUR plus VAT
Project run time:
2005-2006

Logo von Solarwatt AG Photovoltaics

Solarwatt AG

New construction of a production facility in Dresden
Photo: DERU
  • Production facility for solar modules, set up in several construction stages
  • Logistics and packaging
  • Complete development
  • Engineering of any technical systems
  • Service phases according to German HOAI
    • Basic evaluation to construction supervision

Gross floor space 1st construction stage:
ca. 7,500 m²
Gross floor space 2nd construction stage:
ca. 9,300 m²
Costs of the technical systems (1st and 2nd construction stage):
ca. 5.2 m EUR plus VAT
Project run time:
2002-2006

Logo von Global Digital Disc GmbH & Co. KG Semi-conductors

Global Digital Disc GmbH & Co. KG

Conversion of a hall into a production facility for optical data storage in Ottendorf-Okrilla
Photo: DERU
  • Site development
  • Engineering of any technical systems as
    • Catalytic combustion for air containing solvent with heat recovery
    • Clean room construction
  • Service phases according to German HOAI
    • Preliminary engineering to construction supervision
    • Approval procedure according to German BImSchG
  • Organisation and monitoring of the relocation

Gross floor space:
ca. 4,500 m²
Clean room space:
ca. 1,100 m²
Clean room space:
8 according to DIN EN ISO 14644-1
Costs of the technical systems:
ca. 4.9 m EUR plus VAT
Project run time:
2001-2003